top of page

RGK carries out the development of engineering projects in multidisciplinary fields. We have an engineering staff ready to anticipate customer demands as needed.

GPA MALLS

Atualizado: 31 de ago. de 2018

Mall Interlagos: Expansion and revitalization of the mall

  (store front)

 

| Extension and revitalization of the Interlagos mall

| Reinforcement structure to meet the anchor store overloads, elevators and facade structure

| Study of metallic coverage in order to meet both the overload and use, and the architectural bias proposed by partner A2

| Projects involved: Civil, Metallic, Hydraulic, Electrical, Fire and Air Conditioning






Posts recentes

Ver tudo

RCHLO

IMC

BESNI

bottom of page